PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Connecting the copper piping to the 3rd floor VAV Boxes Facing East.jpg Copper piping at the 2nd floor Bathrooms Facing North.jpg Copper piping at the 4th floor Facing North.jpg Erecting stone panels at the North Elevation.jpg Installing Elev. 1,2,3 guide rails Facing West.jpg
Next page Connecting the copper piping to the 3rd floor VAV Boxes Facing East
Connecting the copper piping to the 3rd floor VAV Boxes Facing East